Vestas Wind Systems
Heavy Electrical Equipment
Denmark
ESRS disclosure: ESRS E4 \ DR E4.IRO-1 \ Paragraph 18
Tags Tree
Selected: 0
No matching results found.
- Has the undertaking utilized biodiversity and ecosystems scenario analysis to inform the identification and assessment of material risks and opportunities over short-, medium-, and long-term time horizons? If so, provide a detailed account of the processes employed to verify the business model(s) using a range of biodiversity and ecosystems scenarios, or other scenarios that model biodiversity and ecosystems-related consequences, with different possible pathways.
-
Question Id: E4.IRO-1_10
The analysis of transition and physical biodiversity risks (including systemic risks) is conducted using third-party software solutions, also allowing assessment of biodiversity risks across multiple future looking scenarios and time horizons, and by leveraging internal and external subject matter expertise. See section E1 IRO-1 on page 65 for more information on the scenarios used in the analysis.
Report Date: 4Q2024Relevance: 80%
- Provide a comprehensive list of material sites within your operations, including those under your operational control, as determined by paragraph 17(a). Specify the biodiversity-sensitive areas impacted by these sites, enabling users to ascertain the location and identify the responsible competent authority concerning the activities outlined in paragraph 16(a) i.
-
Question Id: E4.SBM-3_04
Although we do have facilities located near biodiversity sensitive areas, we have concluded that none of them have a material negative impact on the areas. Therefore, we have no biodiversity specific metrics nor have we set a base year from which progress is measured.
Report Date: 4Q2024Relevance: 50%