Vestas Wind Systems
Heavy Electrical Equipment
Denmark
ESRS disclosure: E4.SBM-3_03
Tags Tree
Selected: 0
No matching results found.
- Provide a comprehensive list of material sites within your operational control, derived from the identification and assessment of actual and potential impacts on biodiversity and ecosystems. This disclosure should include a detailed breakdown of these sites according to the impacts and dependencies identified, as well as the ecological status of the areas, referencing the specific ecosystem baseline level where they are situated.
-
Question Id: E4.SBM-3_03
Although we do have facilities located near biodiversity sensitive areas, we have concluded that none of them have a material negative impact on the areas. Therefore, we have no biodiversity specific metrics nor have we set a base year from which progress is measured.
Report Date: 4Q2024Relevance: 30%