Orsted
ESRS disclosure: ESRS E5 \ DR E5-2 \ Paragraph 20e
Tags Tree
- Provide a detailed description of the actions and resources implemented by the undertaking to prevent waste generation within its upstream and downstream value chain, as per Disclosure Requirement E5-2 related to resource use and circular economy.
-
Question Id: E5-2_05
The materials wasted during construction, operation, and decommissioning constitutes a negative impact. In general, we see two complementary pathways to address waste generation that we must work on simultaneously. Firstly, we must consider if our waste generation can be avoided in the first place, by addressing the challenges at their root cause. This is done as we work to design our assets with minimal reliance on the use of a specific material, for example by switching non-recyclable content with more recyclable content to allow for proper waste treatment. At the same time, we need to ensure that waste is diverted from disposal by enhancing sorting and collection processes as well as supporting the maturation of reuse and recycling markets for our components and materials.
Report Date: 4Q2024Relevance: 65%
- Provide the total amount and percentage of non-recycled waste generated from your operations, expressed in tonnes or kilogrammes.
-
Question Id: E5-5_10
The total amount of non-recycled waste generated is 14,944 tonnes, which is 12% of the total waste in 2024.
Report Date: 4Q2024Relevance: 50%