Orsted
ESRS disclosure: ESRS E5 \ DR E5-2 \ Paragraph 20e
Tags Tree
- Provide a detailed description of the actions and resources implemented by the undertaking to prevent waste generation within its upstream and downstream value chain, as per Disclosure Requirement E5-2 related to resource use and circular economy.
-
Question Id: E5-2_05
The materials wasted during construction, operation, and decommissioning constitutes a negative impact. In general, we see two complementary pathways to address waste generation that we must work on simultaneously. Firstly, we must consider if our waste generation can be avoided in the first place, by addressing the challenges at their root cause. This is done as we work to design our assets with minimal reliance on the use of a specific material, for example by switching non-recyclable content with more recyclable content to allow for proper waste treatment. At the same time, we need to ensure that waste is diverted from disposal by enhancing sorting and collection processes as well as supporting the maturation of reuse and recycling markets for our components and materials.
Report Date: 4Q2024Relevance: 65%
- Provide a detailed account of the methodologies employed to calculate the data pertaining to resource inflows. Specify whether the data is derived from direct measurement or estimations, and disclose the key assumptions utilized in the process.
-
Question Id: E5-4_06
The technical materials for constructing new assets are tracked to provide a detailed understanding of material usage and composition for offshore and onshore renewable energy projects (offshore wind, onshore wind, solar PV, and battery storage assets (BESS) above 100 MW). Material inflows reflect assets currently under construction within the reporting year. Our in-house LCA analysis forms the foundation of the methodology, with the highest maturity for offshore assets. External verified studies supplement the project-specific data for battery energy storage systems (BESS), solar PV, and onshore wind. Material usage is accounted for when main components are recognised as installed. This process involves detailed mapping of materials associated with each main component to ensure accurate tracking and reporting.
Report Date: 4Q2024Relevance: 65%