- Does the undertaking's policy address transitioning away from the use of virgin resources, and if so, how does it incorporate the relative increase in the use of secondary (recycled) resources?
-
Question Id: E5-1_01
As an example of the supplier engagement programme development, we initiated a collaboration with wind turbine manufacturer Siemens Gamesa to use recycled glass fibres for certain new wind turbine blades at our Greater Changhua 2b and 4 offshore wind farms in Taiwan. The intended outcome of our supplier engagement and procurement strategy is to have a firm set of circularity-related supplier requirements in place within the next four to five years. For selected components, recycled materials have already been introduced as a sourcing evaluation criterion, ensuring our gradual transition away from the use of virgin resources.
Report Date: 4Q2024Relevance: 85%
- Provide a detailed description of the actions and resources implemented by the undertaking to prevent waste generation within its upstream and downstream value chain, as per Disclosure Requirement E5-2 related to resource use and circular economy.
-
Question Id: E5-2_05
The materials wasted during construction, operation, and decommissioning constitutes a negative impact. In general, we see two complementary pathways to address waste generation that we must work on simultaneously. Firstly, we must consider if our waste generation can be avoided in the first place, by addressing the challenges at their root cause. This is done as we work to design our assets with minimal reliance on the use of a specific material, for example by switching non-recyclable content with more recyclable content to allow for proper waste treatment. At the same time, we need to ensure that waste is diverted from disposal by enhancing sorting and collection processes as well as supporting the maturation of reuse and recycling markets for our components and materials.
Report Date: 4Q2024Relevance: 65%