Orsted
Electric Utilities
Denmark
ESRS disclosure: ESRS E4 \ DR E4-1 \ Paragraph 13 b
Tags Tree
Selected: 0
No matching results found.
- Provide a detailed description of the resilience of your strategy and business model concerning biodiversity and ecosystems. Include the scope of the resilience analysis as it pertains to your own operations, as well as your upstream and downstream value chain, and specify the risks considered in this analysis.
-
Question Id: E4-1_02
Through our double materiality assessment (DMA), we have identified material biodiversity-related impacts and an opportunity in our business, both in our own operations and in our value chain. Identifying and assessing these impacts help us to understand how we can continue to strengthen resilience across our operations, which we also assess using the methodology of the Taskforce on Nature-related Financial Disclosures (TNFD).
Report Date: 4Q2024Relevance: 65%
- Does the undertaking have sites located in or near biodiversity-sensitive areas? Additionally, do activities related to these sites contribute to the deterioration of natural habitats, the habitats of species, or disturb species within designated protected areas?
-
Question Id: E4.IRO-1_14
In addition to the operational sites, we had 12 assets under construction in 2024, which were identified as material sites that temporarily have activities negatively affecting biodiversity-sensitive areas.
Report Date: 4Q2024Relevance: 60%