Orsted
Electric Utilities
Denmark
ESRS disclosure: ESRS E1 \ DR E1-1 \ Paragraph 16 i
Tags Tree
Selected: 0
No matching results found.
- Has the transition plan for climate change mitigation been approved by the administrative, management, and supervisory bodies?
-
Question Id: E1-1_14
Governance and oversight of the transition plan: Matters related to the transition plan are addressed within our sustainability governance framework. The elements of our transition plan are fully disclosed in our annual report, which is presented to shareholders for approval at the annual general meeting (AGM), providing them with an opportunity to offer feedback.
Report Date: 4Q2024Relevance: 60%
- Provide detailed information regarding the types of contractual instruments utilized for the sale and purchase of energy, including those bundled with attributes related to energy generation or for unbundled energy attribute claims. This disclosure should align with the requirements outlined in Disclosure Requirement E1-9, focusing on the anticipated financial effects from material physical and transition risks, as well as potential climate-related opportunities. Ensure that the information adheres to the qualitative characteristics of useful information as specified in ESRS 1 Appendix B. Additionally, when calculating gross Scope 2 GHG emissions, apply both the location-based and market-based methods, and disclose the share and types of contractual instruments accordingly.
-
Question Id: E1-6_23
All electricity purchased and consumed by Ørsted is covered with certificates, ensuring it has been produced using renewable sources. Therefore, our market-based scope 2 GHG emissions from power consumption amounted to zero tonnes carbon dioxide equivalents. We cover 100% of our own electricity consumption with unbundled renewable electricity certificates.
Report Date: 4Q2024Relevance: 60%