HOCHTIEF
Construction & Engineering
Germany
ESRS disclosure: ESRS E1 \ DR E1-1 \ Paragraph 16 i
Tags Tree
Selected: 0
No matching results found.
- Has the transition plan for climate change mitigation been approved by the administrative, management, and supervisory bodies?
-
Question Id: E1-1_14
The reduction targets are science-based, align with the 1.5 degree target under the Paris Climate Agreement and the requirements of the Science Based Targets initiative (SBTi), and have been formally adopted by the HOCHTIEF Executive Board.
Report Date: 4Q2024Relevance: 75%
- Provide the carbon prices applied per metric tonne of greenhouse gas emission, specifying the type of scheme and the critical assumptions used to determine these prices. Include the source of the applied carbon prices and the rationale for their relevance to the chosen application. Optionally, disclose the calculation methodology, indicating whether scientific guidance was utilized and how future developments align with science-based carbon pricing trajectories.
-
Question Id: E1-8_04
We do not yet have internal carbon pricing. We took preliminary steps toward developing such a carbon price in the reporting year. We have developed an initial approach that has not yet been implemented but is currently being tested and analyzed.
Report Date: 4Q2024Relevance: 30%