Cellnex
Communications Equipment
Spain
ESRS disclosure: ESRS E4 \ DR E4-1 \ Paragraph 15
Tags Tree
Selected: 0
No matching results found.
- Provide the transition plan detailing how the business model and strategy will be aligned with the Kunming-Montreal Global Biodiversity Framework, the EU Biodiversity Strategy for 2030, and the planetary boundaries concerning biosphere integrity and land-system change.
-
Question Id: E4-1_07
The nature strategy shall include both the own operations and the value chain, to effectively collaborate with other stakeholder to improve the nature performance. The nature strategy will consist of a practical transition plan, with specified actions and targets per business unit and country. It is to be developed not only to determine new actions to be taken, but also to align already existing initiatives and policies across the organisation.
Report Date: 4Q2024Relevance: 60%
- Has the undertaking identified any material impacts related to ecosystems, and if so, can you provide metrics that measure the area coverage of the affected ecosystems, such as habitat or forest cover, without considering the quality or condition of these areas?
-
Question Id: E4-5_24
Ecosystem Type Surface area assets (km²) Surface area assets (%) 1. Artificial surfaces 5.86 56.9% 2.1. Homogeneous Agricultural Area 2.69 26.1% 2.2. Heterogeneous Agricultural area 0.67 6.5% 3.1. Forests 0.64 6.2% 3.2. Shrub and/or herbaceous 0.37 3.6% 3.3. Open spaces with little or no vegetation 0.03 0.3% 4. Wetlands 0.03 0.3% Grand Total 10.30 100.0% Report Date: 4Q2024Relevance: 85%